Re: Schedule Jobs in Postgres
От | scott.marlowe |
---|---|
Тема | Re: Schedule Jobs in Postgres |
Дата | |
Msg-id | Pine.LNX.4.33.0305140942100.30919-100000@css120.ihs.com обсуждение исходный текст |
Ответ на | Re: Schedule Jobs in Postgres ("scott.marlowe" <scott.marlowe@ihs.com>) |
Список | pgsql-general |
On Wed, 14 May 2003, scott.marlowe wrote: > On Wed, 14 May 2003, Madhavi Daroor wrote: > > > Hi all, > > My company ZONIAC INDIA PVT LTD is extensively using Pstgres as the > > database for their product. And right now I'm in need to schedule a job that > > inserts a record into a table based on the value of a field in another > > table. How can I do this? Please let me know as soon as possible. It is > > URGENT!!!. > > > > I'm not talking about triggers because no other event is triggering this > > particular job. This job must be scheduled so that as soon as the difference > > between the value in a field and a particular date is reduced to 1 day, a > > record is inserted in another table. > > You're likely gonna need to write a cron job that runs when the date > changes, or whatnot. Then, you can run it with something like: > > psql dbname -c -- 'query goes here' > > Basically, making things happen on at a certain time is cron's job. To add to this, it might work by writing a stored proc or something similar that does the checking, then schedule a cron job to run every 5 minutes or so and call that stored procedure. That way, most of the code is in postgresql, and all the cron job does is give it a wake up call every so often.
В списке pgsql-general по дате отправления: