Re: [HACKERS] Re: [COMMITTERS] pgsql: Remove pgbench "progress" testpending solution of its timing is (fwd)
От | Heikki Linnakangas |
---|---|
Тема | Re: [HACKERS] Re: [COMMITTERS] pgsql: Remove pgbench "progress" testpending solution of its timing is (fwd) |
Дата | |
Msg-id | 70277469-1f81-0216-6ac7-c6081c141b10@iki.fi обсуждение исходный текст |
Ответ на | Re: [HACKERS] Re: [COMMITTERS] pgsql: Remove pgbench "progress" testpending solution of its timing is (fwd) (Fabien COELHO <coelho@cri.ensmp.fr>) |
Ответы |
Re: [HACKERS] Re: [COMMITTERS] pgsql: Remove pgbench "progress" testpending solution of its timing is (fwd)
|
Список | pgsql-hackers |
On 18/07/18 23:29, Fabien COELHO wrote: >>>> Hmm. How about we just remove this special case from doCustom(): >>>> >>>>> case CSTATE_START_THROTTLE: >>>>> // ... >>>>> if (duration > 0 && st->txn_scheduled > end_time) >>>>> { >>>>> st->state = CSTATE_FINISHED; >>>>> break; >>>>> } >>>> >>>> That way, we let the client go into CSTATE_THROTTLE state, even though >>>> we know that the timer will run out before we reach txn_scheduled. >>>> Then it will work the way we want, right? One small difference is that >>>> then the clients will keep the connections open longer, until the >>>> timer expires, but I think that's reasonable. Less surprising than the >>>> current behavior, even. >>> >>> Hmmm... in this instance, and if this test is removed, ISTM that it can >>> start the transaction, re-establishing a connection under --connect, and >>> the transaction will run to its end even if it is beyond the expected end >>> of run. So removing this test does not seem desirable. >> >> Can you elaborate? I don't think that's how it works. In threadRun(), we have >> this: > > The state path I want to avoid is, without getting out of doCustom, is: > > CHOOSE_SCRIPT: > -> START_THROTTLE (i.e. under -R) > START_THROTTLE: > update txn_schedule, which happen to be after end_time, > i.e. the transaction is scheduled after the expected end of the run. > but if the condition is removed, then proceed directly to > -> THROTTLE > THROTTLE: > if now has passed txn_schedule (we are late), no return, proceed > directly to -> START_TX > START_TX: > -> START_COMMAND > START_COMMAND: executed... & "return" on SQL, but it is too late > for stopping the tx now, it has started. > > Maybe I missed something, but it looks to me that we can get in the > situation where a transaction scheduled beyond the end of run is started > anyway if it happens that it was a little late. > >> [... threadRun ...] >> As soon as the -T timer is exceeded, the above code will close all >> connections that are in CSTATE_THROTTLE state. > > So threadRun() would not have the opportunity to stop the scheduled > transaction, even if beyond the end of run, because it would not have got > out of doCustom, in the case I outlined above. I see. Instead of moving to FINISHED state, then, we could stay in THROTTLE state, and 'return' out of doCustom(), to give the code in threadRun() a chance to detect that the timer is up. Something like the attached. (I moved the check after the check for latency_limit, because that code updates txn_scheduled. Seems more like a more correct place, although that's as a separate issue.) - Heikki